MHIENG Awarded Contract for Gas Turbine Power Plant CO2 Capture:
Mitsubishi Heavy Industries Engineering (MHIENG) was awarded a Front End Engineering Design (FEED) study of a CO2 capture plant applied to natural gas fired gas turbines for a repowered combined cycle (GTCC) power plant in Alberta, Canada from Capital Power Corporation. MHIENG has achieved the world’s top share of the market with its CO2 capture technology and has received high praise for its performance and expertise in this area.
McCoy CCUS Project ID: 74107
Comentarios