top of page

METAENERGIA Open Cycle Power Plant 72MW:

FATA signed the EPC contract for the construction of a 72MW open cycle power plant of METAENERGIA. The plant, will be built in the Termoli industrial area, consists of n.4 WARTSILA 18V50SG gas engines of 18MW each. The engines will be produced in the WARTSILA factory in Trieste.





19 views

Recent Posts

See All

Kommentare

Kommentare konnten nicht geladen werden
Es gab ein technisches Problem. Verbinde dich erneut oder aktualisiere die Seite.
bottom of page