GPSC SIGNS AN EPC CONTRACT WITH JURONG ENGINEERING FOR A 96 MW SPP REPLACEMENT PROJECT:
Glow SPP 2 Company Limited, one of GPSC’s subsidiaries, signed a contract with Jurong Engineering Limited for the construction of a 96 MW SPP replacement project. The new facility, which is worth approximately four billion baht, will be constructed on the new plot near the existing plant in the Map Ta Phut Industrial Estate in Rayong Province. The plant’s commercial operation is expected to commence in the first half of 2024, maintaining the existing cogeneration capacity.
McCoy Gas Turbine Project ID: 76168
Comments